CATCH-UP & CLEANUP BOOKKEEPING · BUILT FOR CONTRACTORS
Catch-up bookkeeping.
Catch-up and cleanup bookkeeping for contractors, however far back it goes. We’ll tell you what it takes, in writing, before any work starts.
20 MINUTES · NO PITCH · THE WOODLANDS, TX
01 HOW FAR BEHIND
However far back it goes, we’ve seen it.
Nobody gets behind on purpose. You got busy running jobs. Here’s what it usually looks like.
A FEW MONTHS
Common, and usually a quick lift. You’ll be current inside a few weeks.
SIX MONTHS TO A YEAR
Most of what we see. Normal. It’s a bigger job, not a different one.
MORE THAN A YEAR
We’ve done it. It takes longer, and that’s the only difference.
NOT SURE
Also fine. Figuring that out is what the call is for.
02 WHAT CATCHING UP INVOLVES
We don’t just backfill. We build the system underneath.
Getting current is the first half. The second half is making sure it doesn’t happen again.
- Every account, card and loan reconciled back to where the gap starts
- A chart of accounts and cost codes built for how you actually run jobs
- Costs put back on jobs wherever your records support it, and a straight answer where they don’t
- 1099s reviewed across the catch-up period, so nothing is sitting exposed
- Your books handed back clean, current, and ready for your CPA
This is our Setup & Onboarding engagement, the same foundation every client starts with, scoped to how far back we’re going.
03 WHY CONSTRUCTION CATCH-UP IS DIFFERENT
Getting current is one thing. Knowing what’s recoverable is another.
Catching up a contractor isn’t the same as catching up a retail shop. Some of your job history can be rebuilt. Some of it can’t, and anyone who tells you otherwise is guessing with your numbers.
WHAT WE CAN REBUILD
Where your records carry job information like POs, invoices, and sub bills coded to a site, we put those costs back on the jobs they belong to.
WHAT WE CAN’T, AND WE’LL SAY SO
If a receipt doesn’t say which job it was for, nobody can reconstruct that honestly. You’ll get a straight answer about what’s solid and what isn’t, before you rely on any of it.
1099s, REGARDLESS
Sub payments reconcile from your bank and vendor records no matter how the job records look. Missed or wrong 1099s carry penalties, and this is usually the most urgent thing we find.
From the day you’re current, every job is costed properly and WIP starts working. What we can recover behind you, we will.
04 WHAT IT COSTS
It depends on how far back, and we’ll tell you before we start.
There’s no flat rate, because a four-month catch-up and a two-year catch-up aren’t the same job. Here’s what actually moves the number:
MONTHS BEHIND
How far back the gap goes
TRANSACTION VOLUME
How much moves through in a typical month
ACCOUNTS
How many bank accounts, cards and loans are in play
JOB COSTING
Whether cost codes exist, or have to be built
We scope it on the call and put the number in writing. Nothing starts until you’ve approved it.
05 LET’S TALK
Tell us how far back it goes.
Twenty minutes. We’ll ask how many months, what software you’re on, and how your jobs are set up, then tell you honestly what it takes and what it costs. If we’re not the right fit, we’ll say so.
Book a catch-up scoping callNo cost, no obligation, nothing to sign.

